CALCULATING COST OF PRODUCTION AT UMKM (MSMES) UD MURNI THROUGH MODIFIED ACTION RESEARCH APPROACH

Farhan, Ali and Najib, Debby Farihun (2018) CALCULATING COST OF PRODUCTION AT UMKM (MSMES) UD MURNI THROUGH MODIFIED ACTION RESEARCH APPROACH. CALCULATING COST OF PRODUCTION AT UMKM (MSMES) UD MURNI THROUGH MODIFIED ACTION RESEARCH APPROACH. 01-06. ISSN 2356-3206

[img] Text
ICOEN5-2018-p116-Ali Farhan, Debby Farihun Najib-CALCULATING COST OF PRODUCTION AT UMKM MSMES UD MURNI THROUGH MODIFIED ACTION RESEARCH APPROACH.pdf

Download (751kB)
[img] Text
Peer Review Statement_Calculating Cost of Production at UMKM(MSMES) UD Murni Through Modified ActionResearch Approach.pdf

Download (571kB)

Abstract

This study aims to compile a method of calculating the cost of production at UD Murni, a micro entity engaged in petis manufacturing. The method used in this study is a modified action research, a research that aims to introduce a new policy that has never been done in a Company to improve the effectiveness of its work. The results of this study indicate that UD Murni can use process costing as a method of calculating cost of goods manufactured

Item Type: Article
Uncontrolled Keywords: : production, umkm, action research approach
Subjects: Ekonomi
Depositing User: Unnamed user with email Lib.stiemahardhika@gmail.com
Date Deposited: 18 Jul 2019 08:08
Last Modified: 08 Jan 2021 04:41
URI: http://repository.mahardhika-library.id/id/eprint/519

Actions (login required)

View Item View Item